← Back to list
senior
Registration: 07.11.2022

Patrick Meuli

Skills

Bidding & Negotiations
Construction Engineering
Control
Eng. Documents Review
EPC Contracts Management
Geotechnical Investigations
JV Management
JVx
Management of the company
Negotiations
Organization
Planning & Organization
Program Management
Program Management
Project Management
Technical Director
Technical Documentation

Work experience

Chef d’amenagement
since 08.2021 - Till the present day |NDA
.
Chief Resident Engineer
08.2021 - 10.2022 |Tractebel France
-
Project: Construction of Rogun Hydraulic Dam in Tajikistan. 4 Billion $, 335m high. Job Profile: Employer Representative in the frame of a Fidic white book contract for the whole project. -Representation of the Employer toward the Contractors -Management of Tractebel Engineering and Supervision team on site. -Coordination of Head Office interventions on the project.
Project Management Coaching
04.2018 - 08.2018 |Construction of a VOLTALIA 31MW PV power plant in Bin Ban EGYPT
-
Support of the Project Manager for an efficient implementation of the project including all aspects of the project
Vice chairman
11.2017 - 10.2022 |Future Clean Energy, www.fcepv.com
-
Development of photovoltaic solar projects. See web site: www.fcepv.com
Project Manager
04.2016 - 09.2017 |Razel/Bec- CMC- Petrojet- Concord JV – 402M€ project for the construction of 2 road tunnels 13m diameter 4830m long under the Suez Canal in Ismailia
-
Job Profile Develop work schedule for in time and effective completion of project. Assist contract with a high level of client contact. Ensure site cost are Managed effectively. Manage subcontractors effectively. Manage operative effectively to maximize profitability and motivation. Deal effectively with discipline issues. Achievements After a difficult start due to the Owner's imperative request to launch the works before completion of mobilisation and the numerous JV agreement issues in this project multicultural context, in Sept, the TBMs rate of progress is excellent and the project is catching up at the satisfaction of the Client.
Civil Engineering Manager & Construction Manage
08.2014 - 12.2015 |Total - Moho Nord Project – Integration package in DJENO République du Congo
-
Job Profile Review Civil Works Engineering of the contractor (RENCO) & Part time Construction Manager. Achievements Caught up 3 months delay on the review of the Engineering documents Reorganized TOTAL team and boosted progress of the works significantly.
Civil Engineering & Civil Works Manager
07.2012 - 07.2014 |Total E&P Congo – Branch of Total Co. in République du Congo, 250000 b/d
-
Job Profile In charge of the Civil Works and Engineering Management of the civil works operations of the branch – scope include Tanks erections on backfill, tanks revamping, water treatment plant construction, power plant revamping, pre-stressed concrete FPU maintenance, Wharf revamping etc.
Civil Works Manager & RSES
04.2011 - 07.2012 |Total E&P Congo – Branch of Total Co. in République du Congo, 250000 b/
-
-
Civil & Structures Engineering Manager
02.2009 - 09.2010 |YEMEN LNG – Int’l J.V. for the development of a 7 MTPY LNG project with TOTAL as leader
-
Job Profile In charge of the follow up and control of the EPC Contractor’s (Technip) activities related to civil and structure engineering of the upstream part of the project located in Yemen. Engineering team mobilization control, program control, design & document conformance to specifications control, selection of alternatives solutions, supervision of steel structures shop construction, management of site technical queries process, supervision of geotechnical and topographical investigations and reports. Based in UAE with frequent trips to Sanaa.
Project Manager
02.2008 - 01.2009 |SEFI INTRAFOR JV- Joint venture of SEFI-INTRAFOR Co (Fayat Group) and INTRAFOR HK Co (Bouygues Group)
-
Project: Construction of the 30M€ CAIRO METRO LINE 3 deep underground stations of ATTABA (45 000 m2 & 80m deep diaphragm walls, 11m thick grouted shaft in silty sand at 80m depth). Job Profile Manage JV operations in terms of contractual, administrative, financial, technical, safety & quality aspects. In charge of the interfaces of the JV with the Client (Vinci/Bouygues/Orascom JV) and the Owner (National Authority for Tunnels).
Infrastructures Construction Manage
07.2006 - 01.2008 |Global Alumina Corporation- Toronto based company developing a $4 Bn Alumina refinery project in GUINEE CONAKRY.
-
Job Profile Technical support to the Owner for the construction Management of the infrastructures of the complex. Coordinate with Engineers (Technip, Louis Berger & Tecsult) and Contractors (CCC, Henan Chine & Leduc). Organize & Implement a 10 000 piles program, the stabilization and maintenance of a 50Ha reclaimed platform for Kamsar port facilities, the construction supervision of a 10Ha storm water reservoir excavated in the rock by blasting, the supervision of the excavation and installation of the rocks and granulates quarry, the supervision of the erection of the granulates crushers and the 2 concrete batch plan 90m3/h each, the supervision of a 100m long pre-stressed concrete bridge construction.
Projects Manager & Quality Manager of the Group
02.2004 - 06.2006 |RINCENT BTP SERVICES- Construction Engineering group (France)
-
Job Profile 2004-2006 : KOUDIAT-ASSERDOUNE Dam in Algeria (2M m3 of concrete). Consultant to SEFI-INTRAFOR for works of deep drillings and curtain and consolidation grouting, slopes reinforcement (nail & shotcrete), retaining structures, instrumentation. Carry out a study for Setting up a post-consumer tyres recycling system for EGYPT" - collecting and analyzing the project national data; appraisal of financial, organizational, technical aspects of the system, issuance of a report; obtaining local authorities agreement for a detail study. Initiate French & Local partnerships. Reinforcement of CHATOU BARRAGE: Tiebacks, diagnosis by vibration techniques, struts, propping. Carry out a technical study for the French Federation of Building Contractors (FFB) - the topic was the "Improvement of the strip footing National design rules for light housing founded on water sensitive soil". Execute business plan for the opening of company branch in Recife (Brazil)". Manage the Quality system of the group. Spearhead the centralized technical documentation of the group. Manage of the training Department of the group.
Marine Works Management
04.2003 - 11.2003 |EDF (Electricité de France)
-
Project: Aïn Sukhna 700 MW power plant construction in Egypt (250MUSD) Job Profile Manage offshore construction of the sea water intake, sheet piling structure & breakwater, including contract setting up, specifications finalizations and works supervision (the contractors were "Eiffage" and "The Arab Contractor").
Technical Manager
08.2002 - 03.2003 |VINCI/BILFINGER BERGER JV
-
Project: NAGA HAMMADI barrage construction in Upper Egypt, for irrigation and 64MW hydroelectric plant (300MUSD) Job Profile Technical Management of the Joint Venture for the camp & site installation, the dredging for Nile deviation, bank protection and construction-pit excavation phases. Set up & manage a technical team on site including, Method Engineer, Planning Engineer, design Engineers, Document Controllers. Interface with the consultant (Lahmeyer) and review housing drawings & construction.
Civil Works Coordinator
04.2000 - 07.2002 |EDF (Electricité de France)
-
Project: EAST PORT SAÏD 700MW power plant construction (250MUSD) Job Profile In charge of the coastal & onshore Civil Works lot including sand reclaimed temporary jetty and steel causeways, rip rap, underwater GRP pipes laying, sheet piles structures, extensive program of deep soft clay consolidation. Member of multi-disciplinary EDF Management team with responsibilities including interface with the designer, management of the contractor progress and quality, planning coordination with others lots.
Project Engineer for EGYPT & Quality Manager/Project Engineer France et export
04.1991 - 09.2000 |SPIE FONDATIONS
-
Project Engineer for EGYPT & Quality Manager of the Company (1997 – 2000) Project Engineer France et export (1991 – 1997) Job Profile Carrying out the technical and financial studies, the J.V. contracts and present the tenders for the large projects Design, set up and organize the Quality System of the company and obtaining the ISO 9001 certification in 2000 Projects in Egypt East Port Said port - diaphragm wall tiebacks of the quay (65 MUSD) Aïn Sukhna port - diaphragm wall & tiebacks of the quay (65MUSD) Building Complex of Nile City, Cairo - diaphragm wall, tiebacks, piles, raft, earth moving (40MUSD) Building Complex of San Stephano in Alexandria, Egypt - diaphragm wall, tiebacks, piles, raft, earth moving Projects in France “Eole" Metro Project (SNCF), Paris - grouting (18MUSD); Orly airport – micro piles; Roissy terminal - solid injection; Paris sewerage system - rehabilitation; Franz Liszt car park in Paris - grouting; Metro station of BERCY - diaphragm walls & tie-backs; Hundreds of high voltage lines towers micro piles foundations, etc

Educational background

Civil Engineer (Masters Degree)
Till 1977
Federal Polytechnique School of Lausanne in Switzerland

Additional education

RSES- Responsable Securité Environnement Site
10.2012 - 09.2017
TotalEnergies

Languages

ArabicElementaryFrenchUpper IntermediateEnglishUpper Intermediate